No. |
Date |
Title |
Type of Download |
Additional Information |
1 |
Sep-77 |
Exploring the Use
of 1-Inch Hose in Firefighting |
|
|
2 |
DELETED 3/06 |
Firefighter Incident Safety
and Accountability |
|
Now in Book 101 |
3 |
Sep-77 |
Type IV Buildings – Aluminum |
|
|
4 |
Oct-89 |
Gasoline Tank Truck/Trailer
Rollover Incidents |
|
|
5 |
Jun-87 |
Automobile Fires and Associated
Hazards |
|
|
6 |
Jun-56 |
A Natural Gasoline Leak |
|
|
7 |
Sep-77 |
Fighting Fires with Large Spray
Streams – Part 1 |
|
|
8 |
Feb-88 |
Electrical Hazards at Fires |
|
|
9 |
Dec-56 |
Organic Phosphates – Insecticides |
|
|
10 |
Jun-90 |
Litter basket (Stokes Type) |
|
|
11 |
Sep-77 |
Pressurized Dry chemical Fire
Extinguishers |
|
|
12 |
Oct-69 |
Automatic Sprinkler System |
|
|
13 |
1978 |
Electrical Radiant Heating |
|
|
14 |
Oct-73 |
An Indirect Method of Fighting
Fires in RxR Cars |
|
|
15 |
Apr-88 |
Foam Nozzle – American LaFrance
# 600 |
|
|
16 |
1965 |
Siphon Ejectors |
|
|
17 |
Jun-66 |
Portable Cutting Torch |
|
|
18 |
Nov-03 |
Patient Resolution Guide |
|
|
19 |
DELETED 3/06 |
Roof & Building Construction
(now in Book 29) |
|
Now in Book 29 |
20 |
Feb-82 |
Fuel conservation/Driving Procedures |
|
|
21 |
Nov-66 |
Ladder pipe Operation |
|
|
22 |
Mar-84 |
New Rope for Ladder Halyards
& Equipment Lines |
|
|
23 |
Sep-85 |
Task Force Operations |
|
|
24 |
Dec-81 |
Radio Communications, Parts
I through IV |
|
|
24 |
Dec-81 |
Radio Communications, Parts
IV (6/86) Part VI (8/85) |
|
|
25 |
May-79 |
Problems Encountered in Gymnasium
Floor Fires |
|
|
26 |
Sep-75 |
Recent Lessons Learned |
|
|
27 |
Sep-77 |
Aqueous Film-forming Foam (Light
Water, AFFF) |
|
|
28 |
DELETED 3/06 |
Controlling Natural Gas Leaks
in Polyethylene Pipe |
|
Now in Book 29 |
29 |
Apr-90 |
Training Aids and Equipment |
|
|
30 |
Mar-76 |
Fire Incidents Involving Organic
Peroxides |
|
|
31 |
Apr-76 |
Poly Carbonate Windows |
|
|
32 |
May-86 |
Chain Saw – Parts I through
V |
|
|
33 |
Nov-83 |
Pneumatic Power Chisel |
|
|
34 |
Jun-78 |
Modified Claw Tools |
|
|
35 |
Apr-80 |
Overhaul Procedures |
|
|
36 |
Dec-78 |
Identification of Phencyclidine
& Clandestine Labs |
|
|
37 |
Feb-97 |
Kendrick Extrication Device
(KED) |
|
|
38 |
Apr-97 |
Reciprocating Saw |
|
|
39 |
May-82 |
Lessons Learned 1979 through
1981 |
|
|
40 |
Nov-08 |
Disposable BVM's |
|
|
41 |
Mar-01 |
Procedures for Snake Incidents |
|
|
42 |
Mar-81 |
Single-Station Smoke Detectors |
|
|
43 |
DELETED 3/06 |
Lifeline/Rescue Kit |
|
Now in Book 29 |
44 |
Sep-89 |
Rotary Saw |
|
|
45 |
Nov-83 |
Railroads |
|
|
46 |
Nov-84 |
Double Deck Buses |
|
|
47 |
Mar-85 |
Aircraft Fire/Rescue Procedure |
|
|
48 |
July-89 |
Jacobs Engine Brake “Jake Brake” |
|
|
49 |
Mar-85 |
Polychlorinated Byphenyls (PCB’s) |
|
|
50 |
DELETED 3/06 |
Rescue suspension Harness |
|
D/C from Service |
51 |
Jul-98 |
Patients With Chemotherapy |
|
|
52 |
Apr-88 |
Extending Lifelines |
|
|
53 |
Aug-88 |
Air Ambulance |
|
|
54 |
Jul-88 |
Hazardous Illegal Mezzanines |
|
|
55 |
Dec-00 |
4-Inch Supply Hose |
|
|
56 |
Apr-89 |
Basic Radiation Protection Principles |
|
|
57 |
Nov-88 |
Evacuation Guidelines |
|
|
58 |
Apr-89 |
Instructor Training |
|
|
59 |
Aug-02 |
Methods of Painful Stimulus |
|
|
60 |
Aug-89 |
Methanol Vehicles |
|
|
61 |
Jan-90 |
Scrubber Systems |
|
|
62 |
Jan-93 |
Two-Inch High Rise Hose Systems |
|
|
63 |
May-90 |
Procedures for supplementing
High-Rise Fire Pumps |
|
|
64 |
Jul-98 |
Semi-Automatic Defibrillator |
|
|
65 |
Jun-92 |
Vehicle Battery Systems |
|
|
66 |
DELETED 3/06 |
Sheared Fire Hydrants – Shutting
Off Procedures |
|
In Vol. 2 4/2 90.10 |
67 |
June-08 |
Holmatro Rescue Tool
| |
|
68 |
DELETED 3/06 |
Air Rescue Cushion |
|
In Book 29 |
69 |
Apr-91 |
Maxi-Force Air Bag System |
|
|
70 |
May-92 |
Metro Rail |
|
|
71 |
Nov-92 |
Management of Spontaneous Volunteers |
|
|
72 |
Aug-91 |
V-VAC, Hand Powered Suction
Device |
|
|
73 |
Oct-91 |
Tactical/Operational Considerations
for Personnel |
|
|
74 |
Dec-91 |
Search & Rescue Utilizing One-Inch
Hoseline |
|
|
75 |
Jan-92 |
Bomb Scene Incidents |
|
|
76 |
Mar-99 |
Company Operations Part A, B
& C |
|
|
77 |
Mar-97 |
Live Fire Training |
|
|
78 |
Nov-92 |
Oleo Resin Capsium |
|
|
79 |
Jan-93 |
Using foam Carriers at OFF-Airport
Incidents |
|
|
80 |
Jun-93 |
Nylon Utility Straps |
|
|
81 |
Mar-93 |
Body Armor |
|
|
82 |
Mar-93 |
Infectious Disease Protocols |
|
|
83 |
Jan-00 |
Africanized Bees |
|
|
84 |
Oct-93 |
Metrolink Commuter Train |
|
|
85 |
Jun-00 |
Large Diameter 4-Way Valve |
|
|
86 |
Jan-94 |
Structural Fumigations and Other
Pesticides |
|
|
87 |
Jul-93 |
Spinal Immobilization |
|
|
88 |
Sep-98 |
Compressed Air-Foam Brush Patrol
Apparatus |
|
|
89 |
Jul-93 |
EMS Updates |
|
|
90 |
Oct-93 |
Fire Burns |
|
|
91 |
Jul-93 |
Hyperventilation Syndrome |
|
|
92 |
Sep-93 |
Ideal Model 61-249 Voltage Tester |
|
|
93 |
Sep-98 |
Barricade |
|
|
94 |
Jun-94 |
Asbestos |
|
|
95 |
Oct-94 |
Flow Mix Model 500 – Class “A”
Foam |
|
|
96 |
May-94 |
Wildland Firefighting Protective
Clothing |
|
|
97 |
Aug-94 |
The Key to Effective Communications |
|
|
98 |
Feb-95 |
EMS Report Writing |
|
|
99 |
Sep-94 |
River Rescue – First Responder |
|
|
100 |
Mar-95 |
Determination of Death |
|
|
101 |
Mar-97 |
Standardization of Emergency
Management System |
|
|
102 |
Jul-03 |
Precision Xtra Glucometer |
|
|
103 |
Jan-99 |
Hydro-Foam Equipment |
|
|
104 |
Mar-99 |
Urban Search and Rescue |
|
|
105 |
Jun-02 |
Department Training Reimbursement |
|
|
106 |
Jul-99 |
LCES |
|
|
107 |
Dec-99 |
Mark I Auto Injectors |
|
|
108 |
Jan-00 |
35' Extension Ladder Knot |
|
|
109 |
Sep-00 |
Non-Rebreather Mask and Nasal
Cannula |
|
|
110 |
Mar-01 |
Bullard Thermal Imager |
|
|
111 |
Apr-01 |
Elevator Door Rescue Paddle |
|
|
112 |
Apr-02 |
Foam Tender |
|
|
113 |
Jul-02 |
Alameda Corridor |
|
|
114 |
Aug-02 |
East Central Interceptor Sewer |
|
|
115 |
Aug-02 |
Disaster Cache |
|
|
116 |
Apr-03 |
Metro Rail - Red Line |
|
|
117 |
May-03 |
Port of L.A. Waterfront Red
Car Line |
|
|
118 |
Jun-03 |
Lifepak 12 Defibrillator |
|
|
119 |
Aug-03 |
Conterra Airway Bag/Intubation
Case |
|
|
120 |
Jan-04 |
Sked Rescue System |
|
|
121 |
Jan-04 |
The Tranzport Hood |
|
|
122 |
Aug-04 |
Heavy Lift Gurney |
|
|
| 123 |
Oct-04 |
Radio Frequency Radiation Hazard Awareness |
|
|
| 124 |
Dec-04 |
Evac-U-Splint Fasplint System |
|
|
| 125 |
Jan-05 |
S-Scort VX-2 Suction Device |
|
|
| 126 |
Feb-06 |
Metro Gold Line Eastside Extension Const. Phase |
|
|
| 127 |
Jul-06 |
Inspection Cycles |
|
|
| 128 |
Aug-06 |
Ferno Model 42 Stair Chair |
|
|
| 129 |
Jun-07 |
Utility Belt |
|
|
| 130 |
Jul-07 |
New Ladder Pipe Assembly |
|
|
| 131 |
May-08 |
Holmatro Self-Contained Rescue Tool (SCRT) |
|
|
| 132 |
Sep-08 |
Multitech Modem |
|
|
| 133 |
Oct-08 |
Traffic Signal Preemption System for Emergency Vehicles |
|
|
| 134 |
Nov-08 |
Communication w/MAC on MCI |
|
|
| 135 |
Jul-08 |
Fire Department Operations at Tactical Law Enforcement Incidents |
|
|
| 136 |
Dec-08 |
Aircraft Emergencies Standard Operating Guidelines |
not avail online |
|
| 137 |
|
|
|
|
| 138 |
Aug-09 |
Plug Buggy with Lift Gate Apparatus |
|
|
| 139 |
May-10 |
Air Management Policy |
|
|